Reality Check · Method

How the numbers are made

The Reality Check is a self-assessment. It runs on fictional assets and on what you tell it. Nothing here is measured from your systems. This page explains the scoring, the calculations and the limits.

Engine versions are listed here when the page loads.

Your answers

Each question about your organization takes one of five answers: Yes, Partial, No, Unknown or Not applicable.

Scores and coverage

Each area gets a score from 0 to 100 in steps of 5. The score is based only on the questions you answered (Yes, Partial or No), weighted by importance. Coverage is shown next to it: answered questions out of applicable questions. A high score with low coverage means you've answered too little to rely on it. Areas are never averaged into a single total.

ScoreReading
0–25Exposed: Most answered controls are absent. Expect incidents in this area to be found late and handled manually.
30–50Partial: Some controls exist but are incomplete or informal. Gaps are likely to be where incidents start.
55–75Established: Most controls exist. Remaining gaps are specific and can be closed with targeted work.
80–100Strong: Controls are in place across the answered questions. Verify with evidence before relying on them.

Three kinds of number

A Illustrative episode totals
The live cards during a scenario. They describe what happens in that fictional episode. They are not a forecast for your organization. Replaying an episode rebuilds them, so nothing is added twice.
B Organization estimates
These come from your inputs on the assumptions page. Each estimate shows its formula, low/base/high range and monthly figure. The annual figure is a run-rate (monthly × 12), not a prediction. If an input is unknown, the estimate is left out and replaced by what to measure.
C Potential exposure in one scenario
The possible impact if one specific scenario happened. It is not an expected annual loss, and it is never added to the recurring estimates.

A worked example

20 workers × 15 minutes a day × 22 working days ÷ 60 = 110 hours a month. Valued at €40 an hour, that is €4,400 of capacity. That's time that could go to other work. It isn't guaranteed cash savings.

Product suggestions

Findings map to needs, and needs map to capabilities the products have today. You get the strongest fit and, at most, one secondary fit, each with the findings behind it. Sometimes the answer is No immediate product recommendation or Validate these facts first. An option using existing tools is always listed. Planned features are never offered as available.

Limits

Start my Reality Check